Rack PDUs and UPS systems. Server racks and cabinets. Structured cabling and MPO/MTP fiber. Liquid-cooling consumables. MERV 13-16 filter banks. NFPA 70E arc-flash PPE. IEC server cords. Cable management. ESD and clean-room consumables. One quote across the BOM, shipped to any site.
A typical critical-facility ops or build team is placing per-category orders with three or four distributors. Filters from one. Arc-flash gear from another. IEC cords from a third. Each with their own lead times, POs, and shipping schedules.
Filters ship in 3 days. Arc-flash gear ships in 10. Server cords ship in 5. Cable management ships in 7. You cannot start the swap or the build until the slowest line lands. Coordination overhead eats half the schedule slack.
Annual electrical safety audit is on the calendar. Filter media certification expires the same month. PPE rotation is due. Three separate suppliers each have their own backorder excuse. The audit does not care.
Engineering changed the cord type or filter MERV rating mid-build. The original distributor does not stock the new spec. Now you are sourcing from scratch on a tight schedule.
Hyperscale operator running concurrent fit-outs at 4 sites. Each site has its own PO, its own delivery schedule, its own substitution list. No way to see the program-level cost or schedule risk.
Upload a spreadsheet, a PDF, a partial markup, or a structured BOM from your PM tool. Spec-grade SKUs by manufacturer and part number get priority parse and stock check.
Critical-path lines flagged on the quote. Sequenced deliveries to match the build calendar, not the slowest distributor's. We coordinate across multiple suppliers behind the scenes. You get one quote that fits your project schedule.
Any address, any access constraint. Sequenced deliveries to match install schedule. with project name and phase tag. Receiving instructions per site requirement.
Single AR contact. NFPA 70E certifications, filter test reports, material safety data sheets bundled with shipments for audit. Project-mode billing supported.
MERV 8 through 16 panel and bag filters. HEPA grades on lead time for higher-spec rooms. Camfil, AAF, Koch, Filtration Group, Air Filter Engineering. Standard sizes plus custom-built panels. Filter housings, gasket seals, change-out PPE.
NFPA 70E CAT 2, 4, plus 40 cal hood-rated assemblies. Salisbury, Oberon, Honeywell, Mechanix. Sized for crew, with documentation for audit. Voltage-rated rubber gloves (Class 0-4) with leather protectors. Insulated hand tools.
Basic, metered, monitored, switched PDUs. Raritan, Vertiv, APC, Geist, Server Technology, Eaton. C13 and C19 outlet density, single-phase and 3-phase, Zero-U and 1U/2U form factors. Replacement outlets, monitoring sensors, environmental probes.
Rack and small floor UPS units. APC Smart-UPS, Eaton 9PX/9SX, Vertiv Liebert, Tripp Lite SmartOnline, CyberPower commercial. Replacement battery cabinets and cells by chemistry and runtime. Standby and online double-conversion topologies.
Open-frame and enclosed cabinets, 12U-48U, 19" / 23", standard and seismic-rated. Tripp Lite SmartRack, APC NetShelter, Belden, Hubbell, Wright Line, Vertiv VR. Rail kits, blanking panels, rack-mount cable managers, levelers and casters.
Cable trays, ladder rack, vertical and horizontal managers, hook-and-loop bundles, Velcro strap kits, J-hooks, basket tray. Panduit, Hoffman, Eaton B-Line, Chatsworth. Sized to match your build standard.
Cat 5e / 6 / 6A / 7 / 8 bulk copper and patch cords. Bulk fiber (OM3, OM4, OM5, OS2 single-mode and multi-mode). MPO and MTP cassettes, trunks, and assemblies. Patch panels, jacks, faceplates. Fiber inspection scopes, cleaning kits, optics testing consumables. Panduit, Belden, CommScope, Berk-Tek, AFL.
C13/C14, C15/C16, C19/C20 in P-lock, L6-30, L21-30. Standard lengths plus custom-cut for cabinet builds. ESD-safe mats, wrist straps, gloves, smocks, anti-static packaging. Clean-room wipes, swabs, IPA solutions, particle-free gloves, clean-room garments.
Coolant hoses, quick-disconnect couplings (Parker, CPC), filtration housings and cartridges, glycol coolants, corrosion inhibitors. 3M Novec dielectric fluids on 2-4 week lead times. CDUs, rear-door heat exchangers, and dry coolers themselves go factory-direct, not through us.
Annual audit requires fresh filter banks at MERV spec. We pre-stage panel sizes and schedule delivery to land 1 week before swap date. Filter test reports included in the documentation package.
Incident triggered review. Crew needs CAT 2 and CAT 4 rotation refresh sized by individual. Documentation package included for compliance file.
2,000-line BOM for cable, racking, PDU, server cords, cable management. Single PO, sequenced deliveries to match install schedule, no contractor-side reshipping.
Same SKU set across 4 build sites. Per-site delivery schedules. Single program-level invoice with site-level cost breakouts. PM gets one view across the program.
Engineering changed the cord type or filter spec mid-project. Existing supplier does not stock it. We track inventory across supplier networks and confirm pricing and lead time within hours.
Ongoing operations need a steady fill of ESD wipes, IPA, anti-static packaging, replacement gloves and brushes. Recurring weekly or monthly fill, shipped to the site.
Yes. Camfil, AAF, Koch, Filtration Group, Air Filter Engineering. Standard sizes plus custom-built bank panels on 1-3 week lead times depending on dimensions.
Yes. CAT 2, 4, plus 40 cal hood-rated assemblies. Salisbury, Oberon, Honeywell. Sized for crew with documentation packages for audit.
Yes. C13/C14, C15/C16, C19/C20 in P-lock, L6-30, L21-30. Standard lengths plus custom-cut for cabinet builds. ITT Cannon, Tripp Lite, AC Infinity, Hubbell.
Yes. Open-frame and enclosed cabinets, 12U-48U, 19" and 23" widths, standard and seismic-rated. Tripp Lite SmartRack, APC NetShelter, Belden, Hubbell, Wright Line, Vertiv VR. Rail kits, blanking panels, rack-mount cable managers. Rack PDUs (basic, metered, monitored, switched) from Raritan, Vertiv, APC, Geist, Server Technology, Eaton in C13 and C19 density, single-phase and 3-phase.
Yes. Rack and small floor UPS units across APC Smart-UPS, Eaton 9PX / 9SX, Vertiv Liebert, Tripp Lite SmartOnline, CyberPower commercial. Standby and online double-conversion topologies. Replacement battery cabinets and cells available separately by chemistry and runtime. Larger central / paralleled UPS plants route through specialty channels with longer lead times.
Yes. Bulk fiber (OM3, OM4, OM5, OS2 single-mode and multi-mode), MPO and MTP cassettes and trunk assemblies, patch panels, jacks, faceplates. Cat 5e through Cat 8 copper for top-of-rack. Fiber inspection scopes, cleaning kits, optics testing consumables. Panduit, Belden, CommScope, Berk-Tek, AFL.
Yes for the consumables and accessories side of the liquid-cooling stack. Coolant hoses and tubing (Parker, Eaton Aeroquip, Gates, Continental). Quick-disconnect couplings (Parker, CPC) for closed-loop reconfigurations. Coolant filtration housings and cartridges (Eaton, Pall, Donaldson, Parker side-stream). Glycol coolants, corrosion inhibitors, biocides. Standard valves (Apollo, Watts, NIBCO) for distribution and isolation.
No. CDUs (Vertiv Liebert, Coolit, Asetek, Stulz), rear-door heat exchangers (Coolcentric, Motivair, Schneider Uniflair), and dry / fluid coolers (Baltimore Aircoil, EVAPCO) are major capital equipment that route through factory-authorized channels. We supply the consumables side that needs replenishment or reconfiguration during the operating life of the system: hoses, quick-disconnect couplings, filtration cartridges, coolants, and standard valves.
3M Novec 7100 / 7300 / 7500 series available through specialty supplier channels with typical 2-4 week lead times. Submer SmartCoolant, Engineered Fluids ElectroCool, Castrol DC Coolant, and other OEM-specific fluids route through their direct sales and are not in our standard supplier lane today.
Stocking sizes in 2-3 business days. Custom panels 1-3 weeks. Tell us the audit date and we will sequence shipments to land before deadline.
Yes. Upload the BOM, we price across our supplier network, deliver by phase to the build site. Standard for fit-out work where the BOM spans 200-2,000 lines.
Yes. We work directly with EPC and MEP firms doing critical-facility build-outs. Single PO, ship to site, schedule-locked deliveries, per project.
Yes. ESD-safe mats, wrist straps, gloves, smocks, cleaning supplies. Anti-static packaging. Clean-room wipes, swabs, IPA solutions, particle-free gloves.
Net-30 with credit review. Major operators and EPC firms typically pre-qualify within 7 days. Project-mode billing supported for milestone POs.
Upload your BOM. We will source it across our network and reply with pricing and lead times, with substitutions clearly flagged.